Skip To Main Content

Construction info: Parking & traffic changes

For students, parents and guests:

As construction continues on our campus this year, several parking, traffic, and building entry procedures have changed for the 2026-27 school year. We know these adjustments may take some getting used to, and our goal is to make arrival and dismissal as safe, efficient, and predictable as possible for everyone.

Please review the information below before the first day of school. We greatly appreciate your patience, flexibility, and partnership as we work together through this exciting period of growth for Bonney Lake High School.

Temporary Main Office

During construction, the Main Office is located next to the lower parking lot across from the Performing Arts Center (PAC).

A light-colored, kidney-shaped desk sits in the foreground of an empty classroom with built-in counters and cabinets in the background.
A paved walkway leads past a grassy area and a recently landscaped slope with gravel and some exposed earth, towards a fenced-off area and trees under a cloudy sky.
In the foreground, large metal ventilation units are stacked and partially assembled, while the background reveals a hallway under construction with exposed ceiling infrastructure and an %22Emergency Exit%22 sign.
In the foreground, chairs and construction materials are stacked, while the background reveals a large, unfinished stage area with metal framing and scaffolding.
A gravel path curves through green grass towards a brick and siding school building with trees in the background.